Friday, November 18, 2011

Getting ready for the switch


                                    





 Here are some pics of them putting in the sewer lines. That was two years ago and now right before Christmas 2011 they want the tap in fee of $1,840.00 plus the expense of having someone dig and install the pipe to the tap in. But , what can ya do.
I have to get some schedule 40 foam core pipe to run under my double wide and break through the block so they can hook up at the end of the house that's closer to the tap in.
That way they won't have to did up that much of the yard. Good idea by the crew I'm getting to install it for me.
So today I'll get the pipe and all the fittings and start to put them together so I'll be ready to hook it up when they have their part done. Sounds easy enough, hope it will be.
Mark, my neighbor is using the same people to put his in. So we're going to coordinate our time to maybe have it put in on the same day if possible. He has some block I can use to support the pipe I'll be putting in and he also has a hammer drill that I can borrow to break through the wall.
The planning stage is well under way, and I hope things go as easily as I have planned. We shall see.